TR 325 over E FORK OF BIG CREEK
2.5 MI NW OF OLIVER · County 045, Illinois · Built 1920 · 1 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
39.515978, -87.708111
This bridge is in worse condition than 96.4% of bridges in County 045. The average bridge in Illinois is 0 years old; this one is 106 years old.
Nearby Bridges
TR 174 over E FORK OF BIG CREEK
Built 1919
TR 327 A over BIG CREEK
Built 1993
TR 315 over E FORK BIG CREEK
Built 2010
TR 158 / N 1200th over Big Creek
Built 2016
TR 343 over S BRANCH CLEAR CREEK
Built 1983
TR 7 A(CLARK CO) over E FORK OF BIG CREEK
Built 1990
TR 327 A over TRIBFLEMINGTON CREEK
Built 2003
TR 373 over S BRANCH CLEAR CREEK
Built 1980
CH 15(FAS 685) over BIG CREEK
Built 1958
TR 327 over MIDDLE FK BIG CREEK
Built 1987
Bridge Details
- Structure #
- 023530500000000
- Year Built
- 1920
- Length
- 16.3 m (53.5 ft)
- Max Span
- 15.9 m
- Width
- 6.1 m (20 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Other
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $95,000
- Total Project Cost
- $143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.