TR 275 / 600th Roa over Sugar Creek
2 MI SW VERMILION · County 045, Illinois · Built 2015 · 2 Lanes · 50 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
39.563583, -87.634528
This bridge is in worse condition than 64% of bridges in County 045. The average bridge in Illinois is 0 years old; this one is 11 years old.
Nearby Bridges
TR 237 over STREAM
Built 1900
TR 237 over SUGAR CREEK
Built 2005
TR 283 over TRIB CLEAR CREEK
Built 2009
TR 267 over CLEAR CREEK
Built 1971
CH 1(FAS 678) over INDIAN CREEK
Built 1960
TR 297 over CLEAR CREEK
Built 1988
TR 317 over SUGAR CREEK
Built 2001
US 150(FAP 91) over Decatur & Eastern IL RR
Built 1967
TR 299 B over INDIAN CREEK
Built 1977
US 150(FAP 91) over SUGAR CREEK
Built 1966
Bridge Details
- Structure #
- 023432300000000
- Year Built
- 2015
- Length
- 60.3 m (197.8 ft)
- Max Span
- 22.3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.