CH 1(FAS 678) over SUGAR CREEK

1 MI N OF ELBRIDGE · County 045, Illinois · Built 1959 · 2 Lanes · 225 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
023320000000000
Year Built
1959
Length
51.2 m (168 ft)
Max Span
19.6 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
225
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.