I88 EB E-W TOLL over NAPERVILLE/WHEAT RD

0.1MI N OGDEN AVE · County 043, Illinois · Built 2007 · 5 Lanes · 73,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
022999200000000
Year Built
2007
Length
59.2 m (194.2 ft)
Max Span
31.4 m
Width
27.4 m (89.9 ft)
Lanes
5
Daily Traffic
73,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.