I-355 NB & SB over US-34

1.1 M.E. OF IL-53 · County 043, Illinois · Built 1989 · 7 Lanes · 147,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
022997800000000
Year Built
1989
Length
57.9 m (190 ft)
Max Span
29 m
Width
43.9 m (144 ft)
Lanes
7
Daily Traffic
147,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$438,000
Total Project Cost
$526,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.