IL 390 EB over MITTEL BL

1.9 MI E. OF I 290 · County 043, Illinois · Built 2015 · 3 Lanes · 27,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
022900500000000
Year Built
2015
Length
46.7 m (153.2 ft)
Max Span
45.7 m
Width
23.3 m (76.4 ft)
Lanes
3
Daily Traffic
27,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.