HOBSON RD over E BR DUPAGE RIVER

0.40 MI W IL-53 · County 043, Illinois · Built 1999 · 2 Lanes · 22,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
022305200000000
Year Built
1999
Length
44.2 m (145 ft)
Max Span
43.4 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
22,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.