IL 83 over DRAINAGE DITCH

0.36 M S OF I-88 · County 043, Illinois · Built 1952 · 6 Lanes · 61,300 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
022200000000000
Year Built
1952
Reconstructed
1975
Length
7.9 m (25.9 ft)
Max Span
3.7 m
Lanes
6
Daily Traffic
61,300
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.