TR 114 over DRAINAGE DITCH

3.8 MI NE OF ARCOLA · County 041, Illinois · Built 2023 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

39.728681, -88.264989

This bridge is in worse condition than 15% of bridges in County 041. The average bridge in Illinois is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
021465200000000
Year Built
2023
Length
19.2 m (63 ft)
Max Span
18.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.