CH 11(FAS 666) over DRAINAGE DITCH
2.5 MI S OF ARTHUR · County 041, Illinois · Built 2007 · 2 Lanes · 1,150 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.6807, -88.466256
This bridge is in worse condition than 16.7% of bridges in County 041. The average bridge in Illinois is 0 years old; this one is 19 years old.
Nearby Bridges
TR-155 over Drainage Ditch
Built 2018
TR 8 A over DRAINAGE DITCH
Built 1993
TR 18 over DRAINAGE DITCH
Built 1986
FAS 666(CH 12) over DRAINAGE DITCH
Built 1979
IL 133 (FAP 749) over DRAINAGE DITCH
Built 1929
PALMER ST(MS 3300) over LOWE DITCH#2
Built 2011
TR 28 over DRAINAGE DITCH
Built 2019
FAS 660 (CH 10) over Jonathan Creek
Built 2024
TR 69 over Jonathan Creek
Built 2020
PROGRESS ST(MS 260 over LOWE DITCH #2
Built 1994
Bridge Details
- Structure #
- 021454700000000
- Year Built
- 2007
- Length
- 19.8 m (65 ft)
- Max Span
- 18.9 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,150
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.