FAP 323(US 36) over HAYES BRANCH DITCH
1.5 MI E OF TUSCOLA · County 041, Illinois · Built 1958 · 2 Lanes · 4,950 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.791628, -88.2526
This bridge is in worse condition than 76% of bridges in County 041. The average bridge in Illinois is 0 years old; this one is 68 years old.
Nearby Bridges
I-57 (SB) over FAP 323(US 36)
Built 1968
I-57 (NB) over FAP 323(US 36)
Built 1968
I-57 (NB) over UPRR & Decatur&Estrn ILR
Built 1969
I-57 (SB) over UPRR & Decatur&Estrn ILR
Built 1969
I-57 (NB) over HAYES BRANCH
Built 1969
I-57 (SB) over HAYES BRANCH
Built 1969
TR 49 over I-57
Built 1969
I-57 (SB) over SCATTERING FORK
Built 1968
I-57 (NB) over SCATTERING FORK
Built 1968
CH 9 over HACKETT BRANCH
Built 1942
Bridge Details
- Structure #
- 021002000000000
- Year Built
- 1958
- Length
- 25.2 m (82.7 ft)
- Max Span
- 9 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 4,950
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $396,000
- Total Project Cost
- $594,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.