CH 4 (FAS 537) over SALT CREEK
.4 MI S FARMER CITY · County 039, Illinois · Built 1958 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
40.238492, -88.642586
This bridge is in worse condition than 82.3% of bridges in County 039. The average bridge in Illinois is 0 years old; this one is 68 years old.
Nearby Bridges
CH 4 (FAS 537) over TRENKLE SLOUGH
Built 1968
WILLIAM ST(MS 7900 over TRIB SALT CREEK
Built 2010
ALLEN ST(MS 2900) over SALT CREEK
Built 1991
MAIN (MS 8000) over SALT CREEK
Built 1996
FAS 1517(US 150) over SALT CREEK
Built 1993
TR 87 over STREAM
Built 1996
IL 54 (FAP 71) over TRIB TO SALT CREEK
Built 1970
TR 262 over SALT CREEK
Built 1980
IL 54 (FAP 71) over I-74
Built 1970
I-74 (EB) over SALT CREEK
Built 1970
Bridge Details
- Structure #
- 020300100000000
- Year Built
- 1958
- Length
- 48.3 m (158.5 ft)
- Max Span
- 11.9 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.