FAP 71 (IL 10 IL 5 over COON CREEK

SE EDGE OF CLINTON · County 039, Illinois · Built 1994 · 2 Lanes · 8,100 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
020005900000000
Year Built
1994
Length
20.6 m (67.6 ft)
Max Span
9.7 m
Lanes
2
Daily Traffic
8,100
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.