FAP 760 (IL 48) over CLINTON LAKE
4 MI N OF WELDON · County 039, Illinois · Built 1976 · 2 Lanes · 1,100 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.188781, -88.744864
This bridge is in worse condition than 82.3% of bridges in County 039. The average bridge in Illinois is 0 years old; this one is 50 years old.
Nearby Bridges
TR 103 over SALT CREEK
Built 1968
TR 238 over SALT CREEK
Built 1976
IL 54 (FAP 71) over CREEK
Built 2002
CH 10 (FAS 543) over STREAM
Built 1968
CH 14 (FAS 1489) over IPC DISCHARGE FLUME
Built 1979
TR 159 over FREINDS CREEK DITCH
Built 1977
FAS 1489(CH 14) over STREAM
Built 1977
FAS 1489(CH 14) over STREAM
Built 1977
TR 175 over DRAINAGE DITCH
Built 1999
TR 238 A over DRAINAGE DITCH
Built 1993
Bridge Details
- Structure #
- 020004500000000
- Year Built
- 1976
- Length
- 70 m (229.7 ft)
- Max Span
- 24.3 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,100
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.