IL 23 over DRAINAGE DITCH

2.4 MI S OF I88 · County 037, Illinois · Built 1926 · 2 Lanes · 3,950 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
019000700000000
Year Built
1926
Reconstructed
2006
Length
17 m (55.8 ft)
Max Span
8.5 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
3,950
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$183,000
Total Project Cost
$275,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.