TR 219 over SPRING POINT CREEK
4 MI WNW MONTROSE · County 035, Illinois · Built 1990 · 2 Lanes · 250 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.178658, -88.449792
This bridge is in worse condition than 15.4% of bridges in County 035. The average bridge in Illinois is 0 years old; this one is 36 years old.
Nearby Bridges
TR 288 over Trib Salt Creek Tr
Built 2016
TR-288 over SECOND SALT CREEK
Built 1994
CH-11 over FAI-70
Built 1960
TR-31 over BRANCH SALT CREEK
Built 1977
TR 41 over SECOND SALT CREEK
Built 2006
TR-288 over FAI-70
Built 1960
CH-13 over FAI-70
Built 1960
I-70 over STREAM
Built 2024
CH-11 SCHNIEDER RD over BR FIRST SALT CREEK
Built 1987
TR-47A over SECOND SALT CREEK
Built 1983
Bridge Details
- Structure #
- 018316500000000
- Year Built
- 1990
- Length
- 23.7 m (77.8 ft)
- Max Span
- 8.8 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.