TR 205 over SPRING POINT CREEK

3.1 MI W OF WOODBURY · County 035, Illinois · Built 1987 · 2 Lanes · 75 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
018315900000000
Year Built
1987
Length
11.6 m (38.1 ft)
Max Span
10.4 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Channel Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.