TR 77 over BEAR CREEK

4.0 MI NW TOLEDO · County 035, Illinois · Built 1983 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
018314600000000
Year Built
1983
Length
17.4 m (57.1 ft)
Max Span
16.5 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.