CH 25(FAS 700) over HURRICANE CREEK

.5 MI W MAPLE POINT · County 035, Illinois · Built 1958 · 2 Lanes · 375 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
018300500000000
Year Built
1958
Length
50.7 m (166.3 ft)
Max Span
16.6 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
375
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.