FAP 332 (IL 1) over SUGAR CREEK
0.5 MI N GORDON JCT · County 033, Illinois · Built 2022 · 2 Lanes · 2,400 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.012994, -87.684719
This bridge is in worse condition than 31.3% of bridges in County 033. The average bridge in Illinois is 0 years old; this one is 4 years old.
Nearby Bridges
FAP-781 (ILL-33) over STREAM
Built 1995
FAP-781 (ILL-33) over STREAM
Built 1995
FAP 332 (IL 1) over SUGAR CREEK
Built 2022
TR-161 over CREEK
Built 1976
FAP 332 (IL 1) over Stream
Built 2023
FAU 8324 -TRIMBLE over STREAM
Built 2010
TR-129 over SUGAR CREEK
Built 1988
FAS-1696 TRIMBLE R over TRIB SUGAR CREEK
Built 1992
TR-262 over SUGAR CREEK
Built 1909
TR-139 over CREEK
Built 1973
Bridge Details
- Structure #
- 017003200000000
- Year Built
- 2022
- Length
- 27.6 m (90.6 ft)
- Max Span
- 25.9 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,400
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.