I-294 SB over ILL 43 (HARLEM AVE)

0.7 M NW ILL 7 P19 · County 031, Illinois · Built 1958 · 3 Lanes · 71,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
016983100000000
Year Built
1958
Length
89.9 m (294.9 ft)
Max Span
18 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
71,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$1,134,000
Total Project Cost
$1,701,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.