I-294 NB over C&NW RR

2.5 M SW ILL 19 P9 · County 031, Illinois · Built 1958 · 3 Lanes · 88,750 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016978700000000
Year Built
1958
Length
49.1 m (161.1 ft)
Max Span
16.8 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
88,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.