Roselle Rd. over I-90
2.7 M W IL 53 · County 031, Illinois · Built 2016 · 8 Lanes · 31,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.064211, -88.079294
This bridge is in worse condition than 17% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 10 years old.
Nearby Bridges
CENTRAL RD over Land and Salt Creek
Built 2018
Commerce Drive over W Br. of Salt Creek
Built 1997
PLUM GROVE RD over SALT CREEK
Built 1957
BASSWOOD ST over TRIB of W BR SALT CR
Built 1989
I-90 over Poplar Creek
Built 2016
Meachem Rd. over I-90
Built 2016
Meachem Rd. over I-90 WB CD RD
Built 2016
MEACHAM-PLUM GROVE over SALT CREEK
Built 1997
HASSEL ROAD over POPLAR CREEK
Built 2013
IL 72 over TRIB OF W BR SALT CR
Built 1930
Bridge Details
- Structure #
- 016965000000000
- Year Built
- 2016
- Length
- 79.3 m (260.2 ft)
- Max Span
- 39.6 m
- Width
- 37.9 m (124.3 ft)
- Lanes
- 8
- Daily Traffic
- 31,000
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.