I-90 EB Jayne Adam over Touhy Avenue

1.2 Mi W. US 45 · County 031, Illinois · Built 2015 · 5 Lanes · 163,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016961000000000
Year Built
2015
Length
103.8 m (340.6 ft)
Max Span
50 m
Width
28.4 m (93.2 ft)
Lanes
5
Daily Traffic
163,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.