NB I-294 over US 12 20-45

0.6 M NW ILL 171 P10 · County 031, Illinois · Built 2020 · 5 Lanes · 76,550 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
016902200000000
Year Built
2020
Length
94.4 m (309.7 ft)
Max Span
47.3 m
Width
30.5 m (100.1 ft)
Lanes
5
Daily Traffic
76,550
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.