CHERRY ST over UNION PACIFIC RR

CHERRY OV UNION P.RR · County 031, Illinois · Built 1940 · 2 Lanes · 800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
016825600000000
Year Built
1940
Reconstructed
2019
Length
53.7 m (176.2 ft)
Max Span
13.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
800
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$359,000
Total Project Cost
$539,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.