JFK BLVD over SALT CR

0.5 M E ARL HTS P5 · County 031, Illinois · Built 1961 · 4 Lanes · 6,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016692000000000
Year Built
1961
Reconstructed
1991
Length
35.8 m (117.5 ft)
Max Span
17.4 m
Width
18.9 m (62 ft)
Lanes
4
Daily Traffic
6,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$746,000
Total Project Cost
$1,119,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.