MIDWAY TERM. RAMPS over IL50 (CICERO AV)

.5M SO OF 55TH · County 031, Illinois · Built 1998 · 1 Lanes · 10,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016656800000000
Year Built
1998
Length
98 m (321.5 ft)
Max Span
29.8 m
Width
7.7 m (25.3 ft)
Lanes
1
Daily Traffic
10,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.