ILLINOIS ST over LOWER LEVEL ILLINOIS

500N-200E TO 100E · County 031, Illinois · Built 1992 · 4 Lanes · 8,150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016651000000000
Year Built
1992
Length
148.4 m (486.9 ft)
Max Span
19.5 m
Width
22.4 m (73.5 ft)
Lanes
4
Daily Traffic
8,150
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,806,000
Total Project Cost
$5,709,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.