I-90WB TO NB STONY over GROUND

0.06 M N 79TH P7C · County 031, Illinois · Built 1958 · 1 Lanes · 4,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
016647700000000
Year Built
1958
Reconstructed
1998
Length
109.7 m (359.9 ft)
Max Span
18.1 m
Width
7.7 m (25.3 ft)
Lanes
1
Daily Traffic
4,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$544,000
Total Project Cost
$816,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.