TO I-90 SKYWAY over US12 20 41 INDIANAPO

0.03 M NW 106TH · County 031, Illinois · Built 1958 · 4 Lanes · 28,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
016643400000000
Year Built
1958
Reconstructed
2004
Length
115.2 m (378 ft)
Max Span
19.1 m
Width
24.7 m (81 ft)
Lanes
4
Daily Traffic
28,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,272,000
Total Project Cost
$1,908,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.