MONROE STREET over UNION STATION TRACKS

100S 400W TO 500W · County 031, Illinois · Built 1924 · 3 Lanes · 4,650 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016626600000000
Year Built
1924
Reconstructed
1989
Length
69.6 m (228.3 ft)
Max Span
15.5 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
4,650
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,586,000
Total Project Cost
$2,379,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.