FULLERTON AVE over N BR CHICAGO RIVER

2400 N & 1900 W · County 031, Illinois · Built 1896 · 4 Lanes · 17,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016608000000000
Year Built
1896
Reconstructed
2003
Length
86 m (282.2 ft)
Max Span
32.3 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
17,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,957,000
Total Project Cost
$2,936,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.