SANDERS RD SB over I-294(TRI-STATE)
.54M N OF WILLOW RD · County 031, Illinois · Built 1988 · 2 Lanes · 6,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.117317, -87.877919
This bridge is in worse condition than 35.3% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 38 years old.
Nearby Bridges
SANDERS RD NB over I-294 (TRI-ST TOLL)
Built 1958
PALATINE WB FRNT R over DES PLAINES RIVER
Built 1925
PALATINE RD over DES PLAINES RIVER
Built 1965
PALATINE EB FRNT R over DES PLAINES RIVER
Built 1965
PALATINE RD over IL 21 US 45 MILWKE
Built 2005
WILLOW RD over I-294 TRI STATE TOLL
Built 1958
US 45 IL 21 MILW.A over WHEELING DRAIN DITCH
Built 1996
IL 21 (MILWAUKEE) over DES PLAINES RIVER
Built 2009
IL 68 (DUNDEE RD) over I-294 TRI STATE TOLL
Built 1958
HINTZ ROAD over WHEELING DRN DITCH
Built 1994
Bridge Details
- Structure #
- 016322700000000
- Year Built
- 1988
- Length
- 88.8 m (291.3 ft)
- Max Span
- 26.6 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 2
- Daily Traffic
- 6,900
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.