SCHOENBECK RD over MCDONALD CREEK
0.7 M N PALATINE P25 · County 031, Illinois · Built 1961 · 2 Lanes · 4,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.120794, -87.946519
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 65 years old.
Nearby Bridges
PALATINE RD over MCDONALD CREEK
Built 2010
MAPLE ST over MCDONALD CREEK
Built 1984
PALATINE RD over IL 83 (ELMHURST RD)
Built 2005
HINTZ RD. over ECHO LAKE
Built 1987
IL 83 (ELMHURST R over MCDONALD CREEK
Built 1960
FAU-2682 WHEELING over MCDONALD CR
Built 1960
IL 83 (ELMHURST R over WHEELING DRN DITCH
Built 2003
MCHENRY RD over WHEELING DRN DTCH
Built 1931
GENEVA DR over MCDONALD CREEK
Built 1998
NORTHGATE PKWY. over BUFFALO CREEK
Built 1988
Bridge Details
- Structure #
- 016309700000000
- Year Built
- 1961
- Length
- 10.5 m (34.4 ft)
- Max Span
- 9.6 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 4,200
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $116,000
- Total Project Cost
- $174,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.