RIDGELAND AVE over BUTTERFIELD CREEK

0.25 M N US 30 P21 · County 031, Illinois · Built 1957 · 2 Lanes · 6,750 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
016302700000000
Year Built
1957
Length
6.3 m (20.7 ft)
Max Span
3.4 m
Lanes
2
Daily Traffic
6,750
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$33,000
Total Project Cost
$50,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.