RIDGELAND AVE over CAL SAG CHANNEL
0.6 M S 115TH P26 · County 031, Illinois · Built 1967 · 4 Lanes · 24,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.674694, -87.778186
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 59 years old.
Nearby Bridges
IL 83 (CAL-SAG RD over NAVOJO CREEK
Built 1968
IL 83 over DITCH
Built 1931
I-294 SB over RIDGELAND AVE
Built 1958
I-294 NB over RIDGELAND AVE
Built 1958
I-294 NB over 115TH ST
Built 1958
I-294 SB over 115TH ST
Built 1958
IL 43 (HARLEM AVE over CAL SAG CHANNEL
Built 1964
I-294 NB over 111TH ST
Built 1958
I-294 SB over 111TH ST
Built 1958
127TH ST over NAVAJO CREEK
Built 2003
Bridge Details
- Structure #
- 016302500000000
- Year Built
- 1967
- Reconstructed
- 2014
- Length
- 132.1 m (433.4 ft)
- Max Span
- 92 m
- Width
- 22.6 m (74.1 ft)
- Lanes
- 4
- Daily Traffic
- 24,300
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,210,000
- Total Project Cost
- $3,315,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.