FAU-2537 BARTLETT over POPLAR CREEK

0.4 M N BODE RD P7 · County 031, Illinois · Built 1936 · 4 Lanes · 11,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
016301000000000
Year Built
1936
Reconstructed
1981
Length
13.1 m (43 ft)
Max Span
12.6 m
Width
29.9 m (98.1 ft)
Lanes
4
Daily Traffic
11,600
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.