STONY NB TO 100TH over STONY ISLAND AVE

0.1 M N 103RD ST · County 031, Illinois · Built 1972 · 1 Lanes · 7,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
016243700000000
Year Built
1972
Reconstructed
2013
Length
443 m (1453.4 ft)
Max Span
44.9 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
7,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,308,000
Total Project Cost
$9,462,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.