LEAVITT ST over I-290 - IL 110 & CTA

0.4 M W OGDEN AVE · County 031, Illinois · Built 1953 · 4 Lanes · 1,350 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016207900000000
Year Built
1953
Reconstructed
1983
Length
78.9 m (258.9 ft)
Max Span
28.3 m
Width
19 m (62.3 ft)
Lanes
4
Daily Traffic
1,350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,514,000
Total Project Cost
$3,771,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.