GENOA AVE over I- 57

0.4 M W IL 1 · County 031, Illinois · Built 1968 · 4 Lanes · 11,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
016203000000000
Year Built
1968
Reconstructed
2010
Length
57.5 m (188.6 ft)
Max Span
28.8 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
11,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,756,000
Total Project Cost
$2,634,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.