ELMHURST SB over I- 90 ADAMS TOLLWAY

.3M S of Oakton · County 031, Illinois · Built 2015 · 4 Lanes · 29,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016150600000000
Year Built
2015
Length
92.8 m (304.5 ft)
Max Span
45.9 m
Width
16.4 m (53.8 ft)
Lanes
4
Daily Traffic
29,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.