US 41 NB to I-55 W over US 41 LSD

1.6 M E of I-94 · County 031, Illinois · Built 2015 · 1 Lanes · 19,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
016150500000000
Year Built
2015
Length
440.1 m (1443.9 ft)
Max Span
54.9 m
Width
13.2 m (43.3 ft)
Lanes
1
Daily Traffic
19,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.