75TH ST over I- 94 RYAN & CTA

2.5 M N 95TH ST · County 031, Illinois · Built 1958 · 6 Lanes · 8,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016114500000000
Year Built
1958
Reconstructed
2002
Length
91.4 m (299.9 ft)
Max Span
25.9 m
Width
29 m (95.1 ft)
Lanes
6
Daily Traffic
8,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,404,000
Total Project Cost
$2,106,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.