91ST ST over I- 94 RYAN & CTA

0.5 M N US 12 · County 031, Illinois · Built 1958 · 4 Lanes · 2,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016114100000000
Year Built
1958
Reconstructed
2004
Length
65.2 m (213.9 ft)
Max Span
25.5 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
2,750
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,102,000
Total Project Cost
$3,153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.