EUCLID AVE over IL 53

3.5 M S US 12 · County 031, Illinois · Built 1963 · 6 Lanes · 18,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
016101800000000
Year Built
1963
Reconstructed
2025
Length
75.6 m (248 ft)
Max Span
22.9 m
Width
29.2 m (95.8 ft)
Lanes
6
Daily Traffic
18,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.