IL 50 (CICERO AVE over I- 57

3.5 M SW I-294 · County 031, Illinois · Built 1967 · 4 Lanes · 18,100 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
016101400000000
Year Built
1967
Reconstructed
2018
Length
78.4 m (257.2 ft)
Max Span
31.9 m
Width
25.4 m (83.3 ft)
Lanes
4
Daily Traffic
18,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.