IL 58 (DEMPSTER S over I- 94 EDENS
4 M N US 14 · County 031, Illinois · Built 1950 · 6 Lanes · 34,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.040853, -87.763503
This bridge is in worse condition than 35.3% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 76 years old.
Nearby Bridges
CHURCH ST over I- 94 EDENS
Built 1950
LINCOLN AVE over I- 94 EDENS
Built 1950
I- 94 EDENS over GOLF RD
Built 1949
OAKTON ST over I-94 EDENS
Built 2024
BECKWITH RD over N BR CHICAGO RIVER
Built 1951
GROSS POINT RD over I- 94 EDENS
Built 1954
GOLF RD over E FK N BR CHI RIVER
Built 1928
IL 58 (DEMPSTER S over N BR CHICAGO RIVER
Built 1966
I- 94 NB EDENS over RR - UP ?
Built 1950
I- 94 SB EDENS over RR - UP ?
Built 1950
Bridge Details
- Structure #
- 016094300000000
- Year Built
- 1950
- Reconstructed
- 1987
- Length
- 79.8 m (261.8 ft)
- Max Span
- 21.6 m
- Width
- 28 m (91.9 ft)
- Lanes
- 6
- Daily Traffic
- 34,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,708,000
- Total Project Cost
- $5,562,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.