HOWARD ST over N SHORE CHANNEL
2.7 M E I-94 · County 031, Illinois · Built 1951 · 4 Lanes · 15,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.019128, -87.710517
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 75 years old.
Nearby Bridges
OAKTON ST over N SHORE CHANNEL
Built 1957
TOUHY AVE over N SHORE CHANNEL
Built 1930
MAIN ST over N SHORE CHANNEL
Built 1908
ASBURY AV over CTA SKOKIE SWFT
Built 2006
RIDGE AVENUE over CTA SKOKIE SWIFT
Built 1995
DEVON AVE over N SHORE CHANNEL
Built 1930
DEMPSTER ST over N. SHORE CHANNEL
Built 2003
CUSTER AVE over CTA SKOKIE SWIFT
Built 1982
CHICAGO AVE-CLARK over CTA SKOKIE SWIFT
Built 1924
US 41 (LINCOLN AVE over N SHORE CHANNEL
Built 1935
Bridge Details
- Structure #
- 016071900000000
- Year Built
- 1951
- Reconstructed
- 1985
- Length
- 68.7 m (225.4 ft)
- Max Span
- 26.5 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 4
- Daily Traffic
- 15,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,663,000
- Total Project Cost
- $2,495,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.