CENTRAL AVE over I- 90 JFK & CTA

1.4 M NW IL 50 · County 031, Illinois · Built 1952 · 3 Lanes · 14,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
016065900000000
Year Built
1952
Reconstructed
2009
Length
78.7 m (258.2 ft)
Max Span
31.4 m
Width
19.9 m (65.3 ft)
Lanes
3
Daily Traffic
14,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,273,000
Total Project Cost
$3,410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.